With the latest floor being completed into a high quality Cat B fitout, it marks the completion of the Eldon House’s full refurbishment transformation.
This project delivers a high-quality office space with stunning terrace areas, designed to enhance both productivity and wellbeing. The space has been finished with a mix of ‘Cat A’ and ‘Cat A+/B’ standard, featuring low-carbon solutions using air source heat pumps and highly efficient LED lighting and controls, supporting a more sustainable future.
Through the rationalisation of riser and plant spaces, we’ve also achieved an increase in Net Internal Area (NIA), maximising efficiency and value across the floor.
An excellent team effort from start to finish.
Client- CLI Dartriver
Project Manager- Bellrock Group
M&E Consultant- FLATT
Architect: Lifschutz Davidson Sandilands
Structural Engineer: HTS Engineering – Heat Transfer Solutions
Project Surveyor MICA PROJECTS LIMITED
M&E Contractors- Buckler Environmental Services Ltd

